SiliciumHex FieldKit

Method library · 44 methods

Design-to-cost and cost engineering methods

Forty-four methods to set a defensible target cost, break it down, find the value, generate and evaluate cost-reduction ideas, negotiate on facts and track attainment — target costing, should-cost, VA/VE, FAST, Kano, QFD, DFM/DFA.

Ready-made playbooks

Target setting workshop 1 h

One hour to set a defensible target cost: top drivers, scenario window, business case check — with confidence grades on every number.

  1. Top-Down Cost Drivers
  2. Cost Window Allocation
  3. Cost Business Case
  4. Estimate Confidence Grading

Should-cost negotiation pack 2 days

Two days to walk into the negotiation with a model, a normalized comparison and a prepared plan — then open the books with the chosen supplier.

  1. Should-Cost Model
  2. Quote Comparison Grid
  3. Negotiation Preparation
  4. Open-Book Costing

Cost redesign sprint 1 week

One week to redesign the expensive parts: analyze functions, run the workshop, apply DFM rules and cost the prototype honestly.

  1. Functional Analysis
  2. Value Engineering Workshop
  3. DFM / DFA Review
  4. Prototype Costing

Gate cost review pack 1 day

One day before each gate: dashboard refreshed, variances explained, attainment measured — and the go/no-go decision documented.

  1. Cost Dashboard
  2. Cost Gate Review
  3. Cost Variance Analysis
  4. Target Attainment Review

Complexity pruning quarter 1 quarter

One quarter to cut what variety costs: measure complexity, standardize parts, modularize the platform and delete the functions nobody misses.

  1. Complexity Cost
  2. Standardization Push
  3. Modular Architecture
  4. Useless Function Hunt

Sourcing cost-push month 1 month

One month focused on bought-in cost: pareto the spend, substitute materials, settle make-or-buy and lock a cost-down curve with key suppliers.

  1. Cost Pareto
  2. Material Substitution
  3. Make or Buy
  4. Cost-Down Agreement

All 44 methods, by stage

Target

Set the cost the market allows — before designing a single part.

Breakdown

Decompose the cost to know exactly where the euros go.

Value

Find what the customer actually values — and what they never asked for.

Generate

Produce reduction ideas from functions, design rules and process rethink.

Evaluate

Grade the estimates and price the risks before deciding.

Negotiate

Align suppliers on real costs: models, openness and prepared plans.

Track

Keep the target visible: dashboards, gates and ownership.

Toolkit

Cross-cutting methods: curves, complexity, quality and estimating tools.